With accelerated urbanization and frequent extreme rainfall events, high-risk urban flooding nodes have become critical vulnerabilities in urban stormwater management. Existing studies mostly evaluate drainage strategies at watershed or urban district scales, while refined simulation and differentiated BGI optimization for typical high-risk waterlogging nodes remain scarce. This study selects four typical high-risk flooding points on Changzhou Island in Guangzhou, constructs a Storm Water Management Model (SWMM), and analyzes existing inundation characteristics under different rainfall return periods (P=1a, 5a, 10a, 20a, 50a, 100a). Based on node types and retrofit conditions, differentiated blue-green infrastructure (BGI) optimization strategies are designed and evaluated using the LID module in SWMM. The results show that the optimized strategies significantly reduce or eliminate inundation under P=1a and 5a conditions, with recession times shortened to approximately one hour. Under P=50a and 100a conditions, the strategies effectively reduce peak flows and delay peak timing, alleviating instantaneous pressure on drainage networks. The runoff reduction rate improves by 0.41%–0.58% compared to the current scenario, with a total volume reduction of 101,190 m3 achieved by BGI under P=100a. The study demonstrates that differentiated BGI optimization for different types of high-risk nodes can markedly improve drainage capacity under conventional rainfall conditions and deliver peak-shaving and hazard-mitigation effects during extreme rainfall. Meanwhile, composite BGI exerts synergistic effects across the source, conveyance and end stages, substantially enhancing the resilience of drainage systems. These findings offer valuable insights for improving stormwater resilience in island-type urban built-up areas.
| Published in | Science Research (Volume 14, Issue 6) |
| DOI | 10.11648/j.sr.20261406.25 |
| Page(s) | 489-502 |
| Creative Commons |
This is an Open Access article, distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution and reproduction in any medium or format, provided the original work is properly cited. |
| Copyright |
Copyright © The Author(s), 2026. Published by Science Publishing Group |
SWMM, Blue-green Infrastructure, High-risk Water-logging Nodes, Storm-water Safety, Changzhou Island
序号 | 参数类型 | 单位 | 参数值 |
|---|---|---|---|
1 | 子汇水区面积 | ha | — |
2 | 子汇水区宽度 | m | — |
3 | 子汇水区平均坡度 | % | — |
4 | 不透水面比率 | % | — |
5 | 不透水地表洼蓄深度 | mm | 1 |
6 | 透水地表洼蓄深度 | mm | 5 |
7 | 无洼地不透水面积百分比 | % | — |
8 | 管道长度 | m | — |
9 | 不透水地表曼宁系数 | — | 0.015 |
10 | 透水地表曼宁系数 | — | 0.24 |
11 | 管道曼宁系数 | — | 0.013 |
12 | 裸土最大入渗速率 | mm/h | 40 |
13 | 草丛覆盖最大入渗速率 | mm/h | 70 |
14 | 最小入渗速率 | mm/h | 2.2 |
节点编号 | 空间特征 | 周边环境与限制 | 蓝绿基础设施条件 | 积水特征 | 现状照片 |
|---|---|---|---|---|---|
1号 | 建筑密集、道路狭窄、无街旁绿化。 | 位于黄埔军校旧址前,属历史文保区,改造受限。 | 无 | 地势低洼,暴雨期积水可达1m,对排水系统压力大 | |
2号 | 建筑密集,局部街段有绿化。 | 南侧邻近农田湿地和水塘,具备一定滞蓄潜力;北侧毗邻白鹤岗,高差大。 | 有部分 | 径流汇集点,最大淹没深度可达1m,已导致居民搬离 | |
3号 | 建筑较松散,街道宽敞,有人行道及绿化带。 | 上游为硬质化严重的城中村,坡度大,绿化率低。 | 丰富 | 上游径流集中,淹没深度可达2m,交通干道频繁积水点 | |
4号 | 地势低洼,道路宽敞,街旁绿化丰富。 | 临近文塔公园下凹湿地与深井涌;受地铁施工影响,与周边水系连通受阻。 | 丰富 | 暴雨期淹没深度约0.8–1m,导致农作物受淹和经济损失 |
节点编号 | 类型 | 改造条件 | 上游汇水特征 | 地势 | 最大积水深度(m) | 周边蓝绿基础设施 | 主要问题 |
|---|---|---|---|---|---|---|---|
1 | 高密度型 | 受限 | 中等 | 低洼 | 1.0 | 无 | 硬质化高,空间受限 |
2 | 坡度大型 | 一般 | 高 | 中等 | 1.0 | 有部分 | 径流集中,高差大 |
3 | 坡度大型 | 良好 | 高 | 低洼 | 2.0 | 丰富 | 上游硬质化严重 |
4 | 低洼型 | 优良 | 中等 | 低洼 | 0.8–1.0 | 丰富 | 水系连通性不足 |
汇水分区名称 | 面积(ha) | 不透水比例(%) | 平均坡度 (°) |
|---|---|---|---|
1 | 20.26 | 38.86 | 11.91 |
2 | 65.58 | 78.63 | 6.47 |
3 | 25.36 | 38.80 | 13.27 |
4 | 19.12 | 59.91 | 3.26 |
5 | 60.50 | 54.16 | 1.06 |
6 | 69.83 | 57.60 | 6.83 |
7 | 7.19 | 77.80 | 1.54 |
8 | 17.70 | 70.23 | 7.19 |
9 | 37.85 | 54.05 | 2.76 |
10 | 16.03 | 74.53 | 6.27 |
11 | 4.93 | 63.99 | 1.35 |
12 | 22.14 | 45.91 | 2.92 |
13 | 14.32 | 50.00 | 5.27 |
14 | 38.70 | 78.25 | 5.63 |
15 | 22.63 | 67.67 | 6.13 |
16 | 4.95 | 75.13 | 3.63 |
17 | 13.73 | 68.49 | 4.95 |
18 | 17.38 | 54.34 | 5.16 |
19 | 27.05 | 80.87 | 3.80 |
20 | 32.06 | 58.98 | 2.79 |
21 | 34.20 | 52.10 | 1.42 |
22 | 43.79 | 47.82 | 3.44 |
23 | 25.35 | 42.69 | 2.46 |
24 | 51.03 | 45.15 | 5.10 |
25 | 26.85 | 70.82 | 4.55 |
26 | 6.06 | 44.12 | 14.42 |
27 | 14.98 | 36.48 | 3.28 |
28 | 10.80 | 43.45 | 8.26 |
29 | 20.89 | 58.30 | 7.13 |
节点编号 | SWMM 管段编号 | 节点类型 | LID设施配置 |
|---|---|---|---|
节点1 | N186-N173 | 高密度型 | 下沉绿地、雨水花园、植草沟、生态调蓄池 |
节点2 | N165-N173 | 坡度大型 | 绿色屋顶、透水铺装、雨水蓄水池 |
节点3 | N84-N63 | 坡度大型 | 绿色屋顶、透水铺装、下沉绿地、雨水花园 |
节点4 | N29-N65 | 低洼型 | 绿色屋顶、透水铺装、雨水蓄水池、山洪截流沟 |
节点 | 1a | 5a | 10a | 20a | 50a | 100a |
|---|---|---|---|---|---|---|
1 | 0.65 | 0.85 | 1.00 | 1.05 | 1.20 | 1.25 |
2 | 0.60 | 0.80 | 0.95 | 1.00 | 1.15 | 1.20 |
3 | 1.20 | 1.50 | 1.65 | 1.80 | 1.95 | 2.05 |
4 | 0.40 | 0.60 | 0.75 | 0.85 | 0.95 | 1.00 |
节点编号 | SWMM 管段编号 | 节点类型 | 主要优化措施 |
|---|---|---|---|
1 | N186-N173 | 高密度型 | 绿色屋顶、透水铺装、雨水蓄水池、山洪截流沟 |
2 | N165-N173 | 坡度大型 | 绿色屋顶、透水铺装、下沉绿地、雨水花园 |
3 | N84-N63 | 坡度大型 | 绿色屋顶、透水铺装、雨水蓄水池 |
4 | N29-N65 | 低洼型 | 下沉绿地、雨水花园、植草沟、生态调蓄池 |
可透水路面 | 生物滞留层 | 绿色屋顶结构 | |||
|---|---|---|---|---|---|
表面洼蓄深度(mm) | 2 | 表面洼蓄深度(mm) | 50~100 | 表面洼蓄深度(mm) | 4 |
植被覆盖率 | 0.1~0.4 | 植被覆盖率 | 0.7~0.8 | 植被覆盖率 | 0.7~0.9 |
表面糙率 | 0.1~0.25 | 表面糙率 | 0.2~0.4 | 表面糙率 | 0.1~0.25 |
铺装厚度(mm) | 100~150 | 种植土壤厚度(mm) | 450~700 | 种植土壤厚度(mm) | 75~150 |
铺装层孔隙比 | 0.12~0.21 | 土壤孔隙率 | 0.3 | 土壤孔隙率 | 0.3 |
铺装层透水率(mm/h) 蓄水层厚度(mm) 蓄水层孔隙比 | 500 | 种植土壤田间持水率 | 0.2 | 种植土壤田间持水率 | 0.2 |
150~450 | 蓄水层厚度(mm) | 200~400 | 蓄水层厚度(mm) | 70 | |
0.4 | 蓄水层孔隙比 | 0.6 | 蓄水层孔隙比 | 0.5 | |
下沉绿地 | 雨水集水池 | ||
|---|---|---|---|
表面洼蓄深度(mm) | 5 | 最大深度(m) | 3 |
植被覆盖率 | 0.7~0.8 | 初始深度(m) | 0.1 |
表面糙率 | 0.2~0.4 | - | - |
种植土壤厚度(mm) | 450~700 | - | - |
土壤孔隙率 | 0.3 | - | - |
种植土壤田间持水率 | 0.2 | - | - |
节点编号 | 现状不透水百分比 | 优化不透水百分比 | 增加绿化率 | LID设施占比 |
|---|---|---|---|---|
1 | 82 | 74 | 4 | 20 |
2 | 74 | 62 | 6 | 40 |
3 | 68 | 58 | 5 | 30 |
4 | 48 | 38 | 5 | 60 |
重现期 | P=1a | P=5a | P=10a | P=20a | P=50a | P=100a |
|---|---|---|---|---|---|---|
对照组径流量(m3) | 507570 | 664950 | 732730 | 800510 | 890120 | 957900 |
现状组径流量(m3) | 413920 | 569640 | 636880 | 704190 | 793260 | 860690 |
优化组径流量(m3) | 410990 | 566210 | 633290 | 700470 | 789390 | 856710 |
现状BGI消解量(m3) | 93650 | 95310 | 95850 | 96320 | 96860 | 97210 |
优化BGI消解量(m3) | 96580 | 98740 | 99440 | 100040 | 100730 | 101190 |
现状径流消减率(%) | 18.45 | 14.33 | 13.08 | 12.03 | 10.88 | 10.15 |
优化径流消减率(%) | 19.03 | 14.85 | 13.57 | 12.50 | 11.32 | 10.56 |
| [1] | 张大伟, 王文杰. 极端暴雨条件下城市排涝能力脆弱性研究 [J]. 防灾减灾工程学报, 2022, 42(5): 112-120. |
| [2] | 黄国如, 李俊, 王凯. 基于城市典型积涝点的排水系统脆弱性分析 [J]. 水资源保护, 2021, 37(3): 45-50. |
| [3] | 高玉琴, 张曼曼, 李凌浩. 蓝绿基础设施在城市雨洪管理中的应用进展 [J]. 人民长江, 2021, 52(6): 12-18. |
| [4] | 周倩倩, 王慧. 低影响开发措施在城市雨洪控制中的适用性研究 [J]. 中国给水排水, 2019, 35(14): 50-55. |
| [5] | Ariyarathna S I, Abeyrathna P W, Jamei E, et al. A Review of the Application of Blue–Green Infrastructure (BGI) as an Effective Urban Flood Mitigation Strategy for Livable and Healthy Cities in Australia [J]. Architecture, 2023, 3(3): 461-476. |
| [6] | Zabłocka B J, Łukasiewicz E. Blue–Green Infrastructure Effectiveness for Urban Stormwater Management: A Multi-Scale Residential Case Study [J]. Land, 2025, 14(7): 1340-1340. |
| [7] | Perrelet K, Moretti M, Dietzel A, et al. Engineering blue-green infrastructure for and with biodiversity in cities [J]. npj Urban Sustainability, 2024, 4(1): 27. |
| [8] | Jagadisan S. Promoting integrated blue–green infrastructure for urban resilience—lessons learned from case studies [J]. Frontiers in Water, 2024, 61474411-1474411. |
| [9] | 闫雪静, 王国辉. 海绵城市建设中低影响开发设施组合优化研究 [J]. 南水北调与水利科技, 2019, 17(4): 162-168. |
| [10] | 杨钢, 郭艳红, 张元勋, 等. 基于SWMM模型的城市雨水管网排水能力分析 [J]. 给水排水, 2018, 54(10): 124-130. |
| [11] | Chiu Y J, Chang L, Lee J. Hydrologic performance assessment of low impact development facilities based on monitoring data and SWMM modeling in an urban catchment in Taiwan[J]. Scientific Reports, 2025, 15:27251. |
| [12] | Ahmadi H; Scott D, Sample D. J.; Behrouz S M. Automated Calibration of SWMM for Improved Stormwater Model Development and Application. Hydrology 2025, 12, 129. |
| [13] | 王军, 赵欣. 基于GIS与SWMM的城市雨水管网排水能力分析 [J]. 人民黄河, 2017, 39(10): 99-104. |
| [14] | 王小杰, 刘庆生. 基于SWMM模型的城市排涝系统失效机理研究 [J]. 水利水电科技进展, 2023, 43(2): 93-100. |
| [15] | 广州市水务局, 广东省气候中心. 广州市中心城区暴雨公式及计算图表 [R]. 广州: 广州市水务局, 2011. (穗水〔2011〕214号). |
APA Style
Tian, C., Yicheng, W., Yingying, C. (2026). Optimization of Blue-Green Infrastructure at High-Risk Waterlogging Points on Changzhou Island, Guangzhou Based on SWMM Simulation. Science Research, 14(6), 489-502. https://doi.org/10.11648/j.sr.20261406.25
ACS Style
Tian, C.; Yicheng, W.; Yingying, C. Optimization of Blue-Green Infrastructure at High-Risk Waterlogging Points on Changzhou Island, Guangzhou Based on SWMM Simulation. Sci. Res. 2026, 14(6), 489-502. doi: 10.11648/j.sr.20261406.25
@article{10.11648/j.sr.20261406.25,
author = {Chen Tian and Weng Yicheng and Chen Yingying},
title = {Optimization of Blue-Green Infrastructure at High-Risk Waterlogging Points on Changzhou Island, Guangzhou Based on SWMM Simulation},
journal = {Science Research},
volume = {14},
number = {6},
pages = {489-502},
doi = {10.11648/j.sr.20261406.25},
url = {https://doi.org/10.11648/j.sr.20261406.25},
eprint = {https://article.sciencepublishinggroup.com/pdf/10.11648.j.sr.20261406.25},
abstract = {With accelerated urbanization and frequent extreme rainfall events, high-risk urban flooding nodes have become critical vulnerabilities in urban stormwater management. Existing studies mostly evaluate drainage strategies at watershed or urban district scales, while refined simulation and differentiated BGI optimization for typical high-risk waterlogging nodes remain scarce. This study selects four typical high-risk flooding points on Changzhou Island in Guangzhou, constructs a Storm Water Management Model (SWMM), and analyzes existing inundation characteristics under different rainfall return periods (P=1a, 5a, 10a, 20a, 50a, 100a). Based on node types and retrofit conditions, differentiated blue-green infrastructure (BGI) optimization strategies are designed and evaluated using the LID module in SWMM. The results show that the optimized strategies significantly reduce or eliminate inundation under P=1a and 5a conditions, with recession times shortened to approximately one hour. Under P=50a and 100a conditions, the strategies effectively reduce peak flows and delay peak timing, alleviating instantaneous pressure on drainage networks. The runoff reduction rate improves by 0.41%–0.58% compared to the current scenario, with a total volume reduction of 101,190 m3 achieved by BGI under P=100a. The study demonstrates that differentiated BGI optimization for different types of high-risk nodes can markedly improve drainage capacity under conventional rainfall conditions and deliver peak-shaving and hazard-mitigation effects during extreme rainfall. Meanwhile, composite BGI exerts synergistic effects across the source, conveyance and end stages, substantially enhancing the resilience of drainage systems. These findings offer valuable insights for improving stormwater resilience in island-type urban built-up areas.},
year = {2026}
}
TY - JOUR T1 - Optimization of Blue-Green Infrastructure at High-Risk Waterlogging Points on Changzhou Island, Guangzhou Based on SWMM Simulation AU - Chen Tian AU - Weng Yicheng AU - Chen Yingying Y1 - 2026/11/25 PY - 2026 N1 - https://doi.org/10.11648/j.sr.20261406.25 DO - 10.11648/j.sr.20261406.25 T2 - Science Research JF - Science Research JO - Science Research SP - 489 EP - 502 PB - Science Publishing Group SN - 2329-0927 UR - https://doi.org/10.11648/j.sr.20261406.25 AB - With accelerated urbanization and frequent extreme rainfall events, high-risk urban flooding nodes have become critical vulnerabilities in urban stormwater management. Existing studies mostly evaluate drainage strategies at watershed or urban district scales, while refined simulation and differentiated BGI optimization for typical high-risk waterlogging nodes remain scarce. This study selects four typical high-risk flooding points on Changzhou Island in Guangzhou, constructs a Storm Water Management Model (SWMM), and analyzes existing inundation characteristics under different rainfall return periods (P=1a, 5a, 10a, 20a, 50a, 100a). Based on node types and retrofit conditions, differentiated blue-green infrastructure (BGI) optimization strategies are designed and evaluated using the LID module in SWMM. The results show that the optimized strategies significantly reduce or eliminate inundation under P=1a and 5a conditions, with recession times shortened to approximately one hour. Under P=50a and 100a conditions, the strategies effectively reduce peak flows and delay peak timing, alleviating instantaneous pressure on drainage networks. The runoff reduction rate improves by 0.41%–0.58% compared to the current scenario, with a total volume reduction of 101,190 m3 achieved by BGI under P=100a. The study demonstrates that differentiated BGI optimization for different types of high-risk nodes can markedly improve drainage capacity under conventional rainfall conditions and deliver peak-shaving and hazard-mitigation effects during extreme rainfall. Meanwhile, composite BGI exerts synergistic effects across the source, conveyance and end stages, substantially enhancing the resilience of drainage systems. These findings offer valuable insights for improving stormwater resilience in island-type urban built-up areas. VL - 14 IS - 6 ER -